[1] HAN Zeng-cui,DAI Ze-heng,LI Guang-bing,et al. Regulation and exploitation of Qiantang Estuary[M]. Beijing: China Water Power Press,2003:77-79. 韩曾萃,戴泽蘅,李光炳,等.钱塘江河口治理开发[M].北京:中国水利水电出版社,2003:77-79. [2] XIE Dong-feng,GAO Shu,WANG Zheng-bing, et al. Numerical modeling of tidal currents,sediment transport and morphological evolution in Hangzhou Bay[J]. International Journal of Sediment Research,2013,30(7):7-10. [3] WU Xiu-guang,LIU Guang-sheng,CHENG Wen-long. 3D numerical simulation of sediment in the Hangzhou Bay based on FVCOM[J]. Hydro-Science and Engineering,2011,4(4):86-96. 吴修广,刘光生,程文龙.基于FVCOM的杭州湾三维泥沙数值模拟[J].水利水运工程学报,2011,4(4):86-96. [4] NI Yong-qiang,GENG Zhao-quan,ZHU Jun-zheng. Study on characteristic of hydrodynamics in Hangzhou bay[J]. Journal of Hydrodynamics,2003,18(4):439-445. 倪勇强,耿兆铨,朱军政.杭州湾水动力特性研讨[J].水动力学研究及进展,2003,18(4):439-445. [5] ZHENG Li-song,YU Xi-ping. Interaction between storm surge and astronmical tide in Hangzhou Bay[J]. Journal of Basic Science and Engineering,2013,21(1):107-115. 郑立松,余锡平.杭州湾内风暴潮与天文潮的耦合效应[J].应用基础与工程科学学报,2013,21(1):107-115. [6] HULSBERGEN C H. Spoilers for stimulated burial of submarine pipeline[C]//OTC. Proc. 18th offshore Technology Conf. Houston:[s.n.],1986:441-444. [7] YANG Li-peng. Study on scour and protection technology for submarine pipeline under wave condition[D]. Qingdao:Ocean University of China,2012. 杨立鹏.波浪作用下的海底管线冲刷与防护技术研究[D].青岛:中国海洋大学,2012. [8] HAN Yan. Study on the erosion protecting technique for submarine pipeline[D]. Qingdao:Ocean University of China,2012. 韩艳.海底管线的冲刷与导流防护技术研究[D].青岛:中国海洋大学,2012. [9] SHAN Dan-dan. Numerical simulation of submarine pipeline self-buried mechanism[D]. Harbin:Harbin Engineering University,2011. 单丹丹.海底管道自埋机理数值模拟研究[D].哈尔滨:哈尔滨工程大学,2011. [10] LAI Xiang-hua,YE Yin-can,WEI Yan-ji, et al. Preliminary study on the process of scouring and self burying of submarine pipeline in Hangzhouwan Bay[J]. Journal of Marine Sciences,2011,29(2):65-71. 向来华,叶银灿,韦雁机,等.杭州湾海底管道冲刷自埋演化过程初步研究[J].海洋学研究,2011,29(2):65-71. [11] JIANG Xiao-jun,LIU Ren-yi,LIU Nan, et al. Method to submarine pipe status inspection in strong tide region: submarine pipe status inspection in Hangzhou Bay[J]. Journal of Zhejiang University: Engineering Science,2009,43(9):1 739-1 742. 姜小俊,刘仁义,刘南,等.强潮地区海底管线状态检测方法研究[J].浙江大学学报:工学版,2009,43(9):1 739-1 742. [12] ZHANG Wei,JIN Xin,WANG Kui. Study on seabed erosion along submarine pipeline from Cezi Island to Zhenhai[J]. Journal of Waterway and Harbor,2013,34(3):193-198. 张玮,金新,汪魁.册镇海底管线沿线海床冲刷原因及冲刷趋势研究[J].水道港口,2013,34(3):193-198. [13] XIE Dong-feng,PAN Cun-hong,CAO Ying, et al. Decadal variations in the erosion/deposition pattern of the Hangzhou Bay and their mechanism in recent 50 a [J]. Acta Oceanologica Sinica,2013,35(4):121-128. 谢东风,潘存鸿,曹颖,等.近50a杭州湾冲淤变化规律与机制研究[J].海洋学报,2013,35(4):121-128. [14] LIU Guang-sheng. The analysis of water-sediment movement on Hangzhou Bay[J]. Zhejiang Hydrotechnics,2013(2):56-60. 刘光生.杭州湾水沙运动特性分析[J].浙江水利科技,2013(2):56-60. |