[1] YAN Xiang-zhen,LIU Jin-kun,XU Zhi-qian,et al. Fatigue reliability test and life prediction of submarine pipeline[J].Journal of China University of Petroleum,2010,34(5):109-113. 闫相祯,刘锦昆,许志倩,等.服役海底管道刚疲劳可靠性试验与海底管道寿命预测[J].中国海洋大学学报:自然科学版,2010,34(5):109-113. [2] HUANG Shi-chang,ZHANG Shu-yu,YU Jiong. Investigation on seabed evolution of Huibieyang zone in Hangzhou Bay[J].Journal of Sediment Research,2005(1):46-52. 黄世昌,张舒羽,余炯.杭州湾灰鳖洋海域海床演变趋势研究[J].泥沙研究,2005(1):46-52. [3] HAO Pin-zheng,PU Xiao-gang. Model test on the channel variation in the dam area of Zhuzhou navigation complex in Xiangjiang[J].Journal of Sediment Research,2005(4):35-40. 郝品正,普晓刚.湘江株洲航电枢纽坝区河段河床变形预报试验研究[J].泥沙研究,2005(4):35-40. [4] LI Meng-guo. A review on mathematical models of sediment in coastal and estuarine waters[J].The Ocean Engineering,2006,24(1):139-151. 李孟国.海岸河口泥沙数学模型研究进展[J].海洋工程,2006,24(1):139-151. [5] CHEN Dao-xin,CHEN Mu-yong,ZHANG Chi. Influence of reclamation projects on hydrodynamic force in offshore and estuary of Wenzhou[J].Journal of Hohai University:Natural Sciences,2009,37(4):457-462. 陈道信,陈木永,张弛.围垦工程对温州近海及河口水动力的影响[J].河海大学学报:自然科学版,2009,37(4):457-462. [6] HU Ke-lin,DING Ping-xing,WANG Zheng-bing,et al. A 2D/3D hydrodynamic and sediment transport model for the Yangtze Estuary of China[J].Journal of Marine Systems,2009,77(1-2):114-136. [7] LU Xiang-xing,SHI Ying-biao,WANG Min. Prediction about seabed erosion/siltation near the water intake of Third-phase Project for Qinshan Nuclear Power Plant[J].Journal of Sediment Research,2000(6):10-15. 卢祥兴,史英标,王敏.秦山核电三期工程取水口冲淤变化研究和预测[J].泥沙研究,2000(6):10-15. [8] China Bay Records Compiling Committee. Chinese bay records:The fifth section[M].Beijing:Ocean Press,1992:40-41. 中国海湾志编纂委员会.中国海湾志(第五分册)[M].北京:海洋出版社,1992:40-41. |