Simulation analysis on scouring and silting stability of the seafloor with submarine pipeline from Cezi Island to Zhenhai

ZHU Fu, YE Yin-can, HUANG Pan-yang, LIU Du-juan

Journal of Marine Sciences ›› 2014, Vol. 32 ›› Issue (1) : 74-81.

PDF(2741 KB)
PDF(2741 KB)
Journal of Marine Sciences ›› 2014, Vol. 32 ›› Issue (1) : 74-81. DOI: 10.3969/j.issn.1001-909X.2014.01.009

Simulation analysis on scouring and silting stability of the seafloor with submarine pipeline from Cezi Island to Zhenhai

  • ZHU Fu, YE Yin-can, HUANG Pan-yang, LIU Du-juan
Author information +
History +

Abstract

According to the monitoring data over consecutive years for the seabed where submarine pipeline is from Cezi Island to Zhenhai, the results indicate seriously scouring phenomenon. For the purpose of making analysis about human activity influence, a two-dimensional numerical model was set up to simulate hydrodynamics and sediment environment of the Hangzhou Bay with Delft3D. This model had been calibrated and validated with observed data of tidal level, currents and suspended sediment concentration. The results show that the reclamation in Xinhongkou of Zhenhai and Jintang Bridge have a great impact on the seabed scouring of the landing position in Zhenhai. The results also show that the water-blocking effect of Jintang Bridge could aggravate the seabed scouring of the slope position in scouring channels, and that the seabed scouring of the extension position in deep pools is closely related with the main navigable hole of Jintang Bridge.

Key words

submarine pipeline / numerical simulation / seabed scouring and silting / development activity influence / Delft3D

Cite this article

Download Citations
ZHU Fu, YE Yin-can, HUANG Pan-yang, LIU Du-juan. Simulation analysis on scouring and silting stability of the seafloor with submarine pipeline from Cezi Island to Zhenhai[J]. Journal of Marine Sciences. 2014, 32(1): 74-81 https://doi.org/10.3969/j.issn.1001-909X.2014.01.009

References

[1] YAN Xiang-zhen,LIU Jin-kun,XU Zhi-qian,et al. Fatigue reliability test and life prediction of submarine pipeline[J].Journal of China University of Petroleum,2010,34(5):109-113.
闫相祯,刘锦昆,许志倩,等.服役海底管道刚疲劳可靠性试验与海底管道寿命预测[J].中国海洋大学学报:自然科学版,2010,34(5):109-113.
[2] HUANG Shi-chang,ZHANG Shu-yu,YU Jiong. Investigation on seabed evolution of Huibieyang zone in Hangzhou Bay[J].Journal of Sediment Research,2005(1):46-52.
黄世昌,张舒羽,余炯.杭州湾灰鳖洋海域海床演变趋势研究[J].泥沙研究,2005(1):46-52.
[3] HAO Pin-zheng,PU Xiao-gang. Model test on the channel variation in the dam area of Zhuzhou navigation complex in Xiangjiang[J].Journal of Sediment Research,2005(4):35-40.
郝品正,普晓刚.湘江株洲航电枢纽坝区河段河床变形预报试验研究[J].泥沙研究,2005(4):35-40.
[4] LI Meng-guo. A review on mathematical models of sediment in coastal and estuarine waters[J].The Ocean Engineering,2006,24(1):139-151.
李孟国.海岸河口泥沙数学模型研究进展[J].海洋工程,2006,24(1):139-151.
[5] CHEN Dao-xin,CHEN Mu-yong,ZHANG Chi. Influence of reclamation projects on hydrodynamic force in offshore and estuary of Wenzhou[J].Journal of Hohai University:Natural Sciences,2009,37(4):457-462.
陈道信,陈木永,张弛.围垦工程对温州近海及河口水动力的影响[J].河海大学学报:自然科学版,2009,37(4):457-462.
[6] HU Ke-lin,DING Ping-xing,WANG Zheng-bing,et al. A 2D/3D hydrodynamic and sediment transport model for the Yangtze Estuary of China[J].Journal of Marine Systems,2009,77(1-2):114-136.
[7] LU Xiang-xing,SHI Ying-biao,WANG Min. Prediction about seabed erosion/siltation near the water intake of Third-phase Project for Qinshan Nuclear Power Plant[J].Journal of Sediment Research,2000(6):10-15.
卢祥兴,史英标,王敏.秦山核电三期工程取水口冲淤变化研究和预测[J].泥沙研究,2000(6):10-15.
[8] China Bay Records Compiling Committee. Chinese bay records:The fifth section[M].Beijing:Ocean Press,1992:40-41.
中国海湾志编纂委员会.中国海湾志(第五分册)[M].北京:海洋出版社,1992:40-41.